top of page

10/12/2020

All derailment shields installed at Florence Yard/Engine Facility. Fixed wiring issues on T1 in engine facility. Finalized Loconet for staging and sketched Loconet wiring map. Glued a section of the LED strip with tacky glue due to pressure sensitive tape not sticking reliably.

bottom of page