top of page

10/31/2019

Framework for backdrop on upper level of peninsula is being installed. Outdoor switch lamp on number post at driveway has been illuminated (first time since 1988!); was erected in early summer, but needed power from driveway lites that were just installed. Outdoor work (except gas firepit) is complete.

bottom of page