top of page

11/18/2019

Major Milestone: Backdrop for upper & intermediate levels installed (202 sq.ft.); still needs joint taping and painting. Gas company here to size up firepit. Added diode to outdoor switch lamp to reduce load and dim the light slightly.

bottom of page