3/28/2020

Additional progress: subroadbed is in place and leveled to the throat of the east staging loop. Passenger main is in place past the Hobokin Station (one switch point still needs to be repaired and a switch at the station needs to be replaced). Slip switch arrived for staging junction. Golden spike is on the horizon!