top of page

6/10/2020

Trains can now traverse the entire layout + staging under dispatcher control. All switches in service are under remote control and fully wired. About 1/2 dozen still need frogs connected, and 3 machines at west staging are not wired since they have no track leading off of them yet. The future 2 additional west staging tracks + roadbed remain to be installed (all equipment is on hand); other projects have temporarily taken precedence.

bottom of page